×

shanghai metro line 1 meaning in English

上海地铁一号线
上海轨道交通一号线

Examples

  1. Caused by the ever increasing passengers , the transport capacity in shanghai metro line 1 is becoming more and more limitable
    摘要介绍了上海地铁1号线目前的运营状况,并分析预测了其客流增长情况及发展趋势;剖析了运能紧张的状况并就应对措施进行了探讨。
  2. The reconstruction project of shanghai metro line 1 is carried cut in accordance with the master plan of the south station , construction subsequence , signal reconstruction plan and vehicle operation organization
    摘要介绍了上海轨道交通1号线上海南站站改建工程的总体设计方案、施工拨接计划、施工顺序、信号改造过渡方案、列车运行组织以及施工拨接的全过程。
  3. The author analyses and predicts the growth and developement trends of the passenger flow , holds that more trains put into running with the present train formation shall be the direct solution and a more effective way to enhance the transport capacity in shanghai metro line 1
    保持当前的列车编组,通过增加上线运营列车数来缩小行车间隔,应是提高上海地铁1号线运能的最直接、有效的方法。
  4. Shanghai metro line 1 and 2 are designed and constructed successfully , the predict of " metro in shanghai is impossible because of the soft clay " is denied completely , and its experience is helpful to improve the metro design and construction in china
    上海地铁一、二号线在自行设计与施工的条件下建成通车,彻底打破了国外曾有人“在这种土质下上海建不成地铁”的预言,为我国的地铁建设积累了有益经验。
  5. Shanghai ' s local transport system was launched with the shanghai metro line 1 , which operated 16 six - car units supplied by the german shanghai metro group ( gsmg ) consortium led by bombardier from october 1992 to april 1995
    简要翻译一下第一段,英语水平有限哈:上海地铁1 、 2号线,中国上海的本地交通系统是由地铁1号线引领开始的,它是由16列6节编组的由庞巴迪领导的德国上海地铁集团( gsmg )财团提供的车辆运转的,从1992年10月到1995年4月。
More:   Next

Related Words

  1. tokyo metro
  2. shanghai plaster
  3. shanghai woman
  4. shanghai dongya
  5. shanghai electric
  6. shanghai panic
  7. shanghai friendshistore
  8. shanghai road
  9. shanghai opera
  10. studiocity shanghai
  11. shanghai meteorological service company
  12. shanghai metro
  13. shanghai metro line 2
  14. shanghai metro line 3
PC Version

Copyright © 2018 WordTech Co.